Two Monolith & Form finishers pulling a screed board across a fresh pour at dawn

POUR 01 · THE FORMWORK

Poured once. Poured right.

Driveways, slabs and finished floors for people who plan to look at them for twenty years. Three crews, engineered mixes, dates that hold.

  • 32 MPa (4,600 PSI) MIX
  • STEEL MESH · SAW-CUT JOINTS
  • 28-DAY CURE · IN WRITING

Pick the finish off the slab

Four mixes we pour most, shot as poured samples, not brochures. Tap one; the sample changes and your pick rides into the quote.

Exposed aggregate concrete sample, river pebbles half sealedPale broom-finished concrete sample with fine parallel linesBurnished concrete sample with soft matte sheen and trowel arcsIntegrally coloured concrete sample in warm umber oxide
Riverstone Exposed10 MM RIVER PEBBLE · SEALED MATTE

We pour fresh sample slabs every winter. Ask to stand on the real thing before you decide; sealed and unsealed halves side by side.

Pick the finish, we'll price it

Why ours don't crack

Cracks start under the slab, not in it. We compact the base, chair the steel, pour an engineered mix and cut relief joints the same day, before the slab picks its own line.

THE WRITTEN PART

A 10-year structural warranty, on paper

Every structural pour leaves with a signed 10-year structural warranty. If a slab of ours fails structurally, we cut it out and pour it again. Paper, not promises.

SUBGRADE, PROOF-ROLLEDCOMPACTED ROAD BASE, 6 IN32 MPa (4,600 PSI) POUR, 4 INSTEEL MESH, CHAIRED MID-SLABSAW-CUT JOINTS, DAY ONEMATTE PENETRATING SEALER
32 MPa (4,600 PSI)STEEL MESH, CHAIREDSAW-CUT JOINTS, DAY ONECURED 28 DAYS

The pour, day by day

You will know what happens, when it happens and what it costs, before any of it happens.

  1. 01

    The number

    Photos and measurements first. A written quote with the mix, the steel and the finish named.

  2. 02

    The contract

    Deposit capped at 10 percent. The balance lands at milestones you sign off, never before.

  3. 03

    The prep

    Demo, box, compact, set steel. This is the week that decides the next twenty years.

  4. 04

    Pour day

    Truck at first light. Screed, float, finish, cut. We are gone by afternoon and the slab is not touched.

  5. 05

    The cure

    Walk it on day two. Drive it on day seven. It keeps hardening for a month; that is the material, not us being slow.

  6. 06

    The handover

    Joint map, sealer schedule and the warranty, signed. Final invoice only after your walk-through.

Walk on our work

Numbers in the units the trade uses, and addresses you can stand on. Ask and we will text you three pours near you; go walk them.

21,400
CUBIC YARDS POURED
2,300
POURS FINISHED
17
YEARS ON THE TOOLS
10
YEAR WRITTEN WARRANTY
Drone view of a new Monolith & Form driveway at dawn, saw-cut joints casting long shadows
  • HARROW FLATSExposed riverstone driveway, poured 2024. Still dead flat, still sealed.
  • CEDAR LOOPGarage slab and crossover for a builder who came back for two more.
  • OLD MILL RISEBurnished patio, forty by twenty. The owners eat dinner out there now.
Marcus Hale, owner of Monolith & Form Concrete, on site at dawn with a rolled plan

Marcus Hale

OWNER · ON THE TOOLS SINCE 2008

If my name is on the docket, I stood on the slab. Ring me, not a call centre.

CALL MARCUS DIRECT

What pours cost here

Published bands, not haggling anchors. Your number depends on access, base and finish; the band is where jobs actually land.

Plain and broom driveways
$8 to $12 / sq ft
Exposed aggregate
$13 to $19 / sq ft
Burnished and polished
$9 to $15 / sq ft
Slabs and shed bases
$6 to $9 / sq ft

Choose the finish. We'll plan the pour.

Pick a mix, send photos and a rough size. A written ballpark inside two days, and a pour date that holds behind it.

Build me one like thisBuy Monolith & Form Concrete, $249 USD