THE BUILD SHEETS
Systems sized from meter data, not roof guesses.
Every quote starts with twelve months of your meter data. We size the array to what you use, not to what fits on the roof. Three builds cover most homes. The full sheets are below.

SYSTEM 01 · 6.6 kW
The 6.6 kW build
For homes spending $300 to $450 a quarter on power. Fifteen panels on a north or west face. It covers daytime use and trims the evening peak.
Panels
15 × 440 W
Inverter
6 kW hybrid
Roof area
29 m²
Yearly yield
9,400 kWh
Panel warranty
25 yrs
Payback
3.4 yrs
From $4,990 after government rebates.
Size this to my meterSYSTEM 02 · 10.2 kW + battery
The 10.2 kW build with storage
For homes spending $450 to $650 a quarter, or anyone home after dark. Twenty-four panels charge the house and the battery by early afternoon. The evening runs on stored power.
Panels
24 × 440 W
Inverter
8 kW hybrid
Battery
10 kWh usable
Roof area
47 m²
Yearly yield
14,600 kWh
Payback
5.2 yrs
From $11,400 after government rebates.
Quote the battery buildSYSTEM 03 · 13.6 kW 3-phase
The 13.6 kW three-phase build
For big loads: ducted air, a pool, an EV in the driveway. Thirty-one panels across two faces. The 10 kW three-phase inverter keeps export inside network limits.
Panels
31 × 440 W
Inverter
10 kW 3-phase
Roof area
60 m²
Yearly yield
19,500 kWh
Panel warranty
25 yrs
Payback
4.1 yrs
From $8,900 after government rebates.
Price the three-phase buildSTORAGE, HONESTLY
When a battery earns its keep
IT EARNS ITS KEEP WHEN
- Evening use above 12 kWh a day
- Export capped at 5 kW by the network
- Outages you want to ride through
- A feed-in tariff that pays little
SKIP IT WHEN
- Most power used while the sun is up
- A generous feed-in tariff
- Budget better spent on more panels
We model both cases on your meter data and show the arithmetic either way. If storage does not pay back inside ten years, we say so.
STRAIGHT ANSWERS
Questions from the quoting desk
What if my roof is shaded?
Shade costs yield, not the whole system. We model it panel by panel from satellite imagery and a site visit. If the numbers fall short, we tell you before you sign.
Do you install on tile and metal roofs?
Yes. Terracotta, concrete tile and metal sheet. Tile roofs take a little longer and the sheet says so. Every penetration is sealed and photographed before panels go down.
What is the export limit?
Most homes can export 5 kW per phase. The inverter is set to the limit the network approves. Storage soaks up what the grid will not take.
Do panels need cleaning?
Rain does most of the work. In dusty spells a rinse once a year holds yield within a few percent. We clean installed systems at cost.
What does the warranty cover?
Panels carry 25 years on output. Inverters carry 10. Our workmanship carries 10. One phone number handles all three.
How long does install day take?
One day for most homes. Two for tile roofs and three-phase builds. The power is off for about an hour while we commission the system.
48-HOUR TURNAROUND
Send a bill. Get a build sheet.
One photo of your last bill and your address is enough to start. The written read comes back inside 48 hours with yield, price and payback.