Carpenters & joiners · est. 2003

Measured twice.Built once.

Decks, renovations, staircases and commercial fit-outs, built by one family crew and priced line by line before a single board is cut.

  • Decks from $28,000
  • Renovations from $45,000
  • Fit-outs from $60,000

Twelve projects a year. Two slots open this quarter.

Twilight over a finished spotted gum deck and cedar-lined pavilion, house lights glowing
The Larchmont PavilionSpotted gum & cedar · Larchmont · 2026
Hall 01 · Who we build for

One workshop, three kinds of client.

Homeowners

Planned work, not patch-ups: decks, renovations and the staircase you stopped noticing years ago. Considered projects for people who read the quote.

Walk the gallery

Builders & GCs

Framing, lock-up and fit-off carpentry from a sub that mans the job on the dates it promised. Capacity, cover and tickets on one sheet.

Capacity & cover

Commercial fit-outs

Cafes, shops and studios built to an opening date, with joinery from our own bench and a program you can show your landlord.

The fit-out door
Hall 02 · Signature project

The Larchmont Pavilion.

Larchmont · nine weeks · $86,000

A spotted gum deck and cedar-lined pavilion built for a family who wanted their evenings outside. Forty-one line items on the quote; the handover figure matched the signed one to the dollar.

Scope of worksSheet 01 · Larchmont
SubframeTreated hardwood bearers and joists, engineer certified
DeckingSpotted gum boards, face-fixed in stainless steel
PavilionCedar-lined roof on concealed span brackets
BalustradeTimber posts with stainless wire, tensioned twice
LightingLow-glow step and rafter circuits, switched separately
FinishTwo coats of penetrating oil, a third at six weeks
The Larchmont pavilion at dusk, rafter lighting on
The pavilion from the gardenPhotographed at dusk · 2026
Hall 03 · The build diary

Ten days at Fenwick Lane.

One deck, day-stamped from set-out to handover. This is the middle of a job, the part most trades never photograph, hung here because it is where the money actually goes.

  1. Day 01

    Set-out

    String lines, footings and post positions checked against the drawings twice before the auger starts. Slow morning, straight deck.

    Day two at Fenwick Lane: string lines, footings and posts set out beside the house
  2. Day 03

    The subframe

    Bearers and joists levelled to a millimetre and photographed before a single board hides them. The subframe is the job; the boards just get the credit.

    Day three: hardwood subframe with a spirit level resting across the joists
  3. Day 06

    Boards down

    Face-fixed in stainless, gaps gauged, every fourth board sighted down its length. The client picked the pattern; we kept it honest.

    Day six: gloved hands fixing straight decking boards with a drill
  4. Day 08

    The balustrade

    Posts plumbed, wire tensioned, then tensioned again the next morning once the timber had its say overnight.

    Day eight: timber balustrade posts with stainless wire being tensioned
  5. Day 10

    Oiled & handed over

    Two coats of oil, a walkthrough board by board, and the site swept back to lawn. The third coat is booked for six weeks out.

    Day ten: the finished deck freshly oiled at dusk, house lights on
Talk your project through with Ray

Ray takes the first call on every new job.

Hall 04 · The materials library

Timber, chosen like paint.

The six species we build with most, and where each one earns its keep. Ask for offcuts at the consult; timber reads differently in your own light.

Sawn hardwood boards stacked end-on, species tones from pale straw to deep brown
The species rack, end-on, in the workshop
  • Spotted gum

    Honey to chocolate, tight grain

    Decking and exposed structure; our default answer

  • White oak

    Pale straw, calm figure

    Staircases, benchtops and interior joinery

  • Blackbutt

    Pale honey, even temper

    Decks and screens where the budget works hard

  • Merbau

    Deep amber, ages to bronze

    Pergolas and hard-working family decks

  • Victorian ash

    Cream to blush, straight grain

    Wall panelling and painted built-ins

  • Walnut

    Deep brown, unmistakable

    Feature stairs and the pieces you touch every day

Hall 05 · How a job runs

Five stages. Money moves at three of them.

You will know what happens, when it happens, and what it costs. In writing, at every stage, before the stage begins.

  1. 01

    The consult

    Thirty minutes on your site with Ray or Marcus. We measure, we listen, and we tell you on the spot whether the budget and the idea belong together.

    No money changes hands

  2. 02

    Design & spec

    Drawings, species, fixings and finishes settled on paper, where changes cost conversation instead of carpentry.

    Design fee, credited to the build

  3. 03

    The fixed quote

    Every line item priced: materials, labour, disposal, the lot. The number you sign is the number you pay.

    10% deposit locks your slot

  4. 04

    The build

    One crew, a dated program, and a swept site every afternoon. You get the foreman's number, not a call centre.

    Staged payments at frame & lock-up

  5. 05

    Handover

    A walkthrough board by board, the warranty in writing, and a site cleaner than the day we arrived.

    Final 10% when you are happy

Get your job priced properly

Ten-year workmanship warranty on every stage.

Hall 06 · Word of mouth

Referred, checked, referred again.

Marcus Copeland walking a couple across their finished deck at golden hour
Marcus walking the Ellerys across their finished deck

“The quote had forty-one lines in it and the handover figure matched every one. The lawn looked better when they left than when they arrived.”

Sarah & Tom Ellery · Larchmont

“They rebuilt our staircase around a working household. Swept every afternoon, names learned by day two, zero drama.”

Priya Narayan · Millbrook

“As a builder I care about one thing: does the sub man the job. Copeland crews turned up every date on the program, twice in the rain.”

Dominic Ferro · Redgate, builder
On the recordLicensed building contractor · LIC. 000000$20M public liability, certificates on request14 regional awards & finalist placings
Hall 07 · For builders & GCs

The sub that mans the job.

Framing, lock-up and fit-off carpentry for builders who need dates held. One foreman, one call sheet, insurances current and lodged before we step on site. Check us against the last sub who let you down.

carpenters on the books, none hired by the day
8
site crews we can run concurrently
3
public liability, certificates before day one
$20M
years subbing to builders who came back
23
Hall 08 · The last wall

Two build slots left this quarter.

Twelve projects a year is the number the standard survives, so the calendar closes when it closes. If your job deserves a place on it, start the conversation now.

Build me one like thisBuy Copeland & Sons Carpentry, $249 USD