DIV 01
Commercial
Office, mixed-use and workplace buildings for developers and owner-occupiers. Structure, envelope and services coordinated under one programme, from demolition to practical completion.
$8M to $80M · New build & redevelopment
Merrow & Slate delivers commercial, multi-residential, industrial and fit-out projects from $5M to $80M. Forty-one buildings since 2009, eleven of them for clients who came back. Read this page the way your panel would. That is how it was written.
STRUCTURE TOPPED OUT · L12 OF 12ELEV. 42.0 MFive numbers a tender panel scores before anyone returns a call. Published here, current to the last financial year, held to the same document control as our drawings.
TRIFR is total recordable injuries per million hours worked. Audited figures, updated each July. Your quantity surveyor is welcome to the workings.
Four divisions, one delivery discipline. Each carries its own preconstruction bench, its own supervisors and the same document control.
DIV 01
Office, mixed-use and workplace buildings for developers and owner-occupiers. Structure, envelope and services coordinated under one programme, from demolition to practical completion.
$8M to $80M · New build & redevelopment
DIV 02
Apartment buildings from mid-rise infill to 200-unit precincts. Waterproofing, fire compliance and acoustic separation treated as structure, not finishing trades.
$10M to $80M · 40 to 220 units
DIV 03
Warehouses, plants and logistics facilities where the programme is measured in tenant lease dates. Precast, tilt-up and long-span steel, with site management self-performed.
$5M to $45M · Design & construct preferred
DIV 04
Commercial interiors delivered inside live buildings, after hours where the asset demands it. Clean sites, sequenced deliveries, no surprises for the tenants above.
$1M to $15M · Occupied-building specialists
Contract MS-2148, exactly as delivered. Five phases, two overlaps planned from day one, practical completion eleven days early. We publish one real programme because every builder claims discipline and a drawn programme cannot lie for long.
Early works
FEB 24 - APR 24
Structure
APR 24 - DEC 24
Envelope
SEP 24 - MAR 25
Services & fit-out
NOV 24 - MAY 25
Practical completion
PC - 12 JUN 25
Programme extract from the Northbank Exchange delivery records. Milestone dates as certified at practical completion.
Six sheets from forty-one. Every project carries its client, value band, role and delivery method, because a photograph proves nothing a panel can score.

Client · Halberd Property Group
A twelve-storey commercial building over a two-level podium, delivered design and construct on a live arterial corner. Topped out on programme and handed over eleven days early.
D&C · DELIVERED 2025 · PC 11 DAYS EARLY

Client · Fenwick Development Partners
Three residential buildings over a shared basement. Waterproofing and facade systems were benchmarked at sample stage and inspected against that benchmark, floor by floor.
D&C · DELIVERED 2024 · 142 UNITS SETTLED

Client · Ridgemont Schools Trust
A library and teaching building delivered on an operating campus. Early contractor involvement cut nine weeks from the structure package before a contract was signed.
ECI · DELIVERED 2024 · LIVE CAMPUS

Client · Vantage Workspace Co.
Four floors of workplace fit-out inside an occupied tower. Every delivery was sequenced through a live loading dock and the tenants below never lodged a complaint.
LUMP SUM · DELIVERED 2025 · AFTER-HOURS

Client · Corriedale Logistics
A precast logistics facility delivered in thirty-four weeks against a lease commencement date. The programme was the contract, and it did not move.
D&C · DELIVERED 2023 · 34-WEEK PROGRAMME

Client · City of Harborfield
A civic annex delivered under construction management for a public client, with probity reporting and open-book trade procurement at every package letting.
CM · DELIVERED 2023 · PUBLIC PRECINCT
The document your panel actually wants
The full statement: divisions, systems, safety record, bench, referees. No form between you and it.
Safety on our sites is not a poster in the shed. It is a published metric, a certified system and a standing induction, audited by people who do not report to the project. When a number moves, the board hears about it in the same week.
ISO 9001 · QUALITY · CERT NO. 000000
ISO 45001 · SAFETY · CERT NO. 000000
ISO 14001 · ENVIRONMENT · CERT NO. 000000
Named people, stated years, the projects they personally ran. Bench depth is a scored criterion, so here is ours.

Managing Director
Co-founder · 28 years in construction

Delivery Director
17 projects delivered · Northbank Exchange, Fenner Quarter

Preconstruction Manager
Nine years in preconstruction · ECI and D&C bids
Re: Your next project
You have a site, a proforma and a board that wants certainty. We have a bench that has delivered forty-one buildings without leaving a single client in dispute. The conversation costs an hour, and the capability statement is already on this page.
Send the tender documents as they stand, or start with five questions. Either way, we come back inside two business days with a named director attached.